
Dehradun District
Solar Panel Installation in Dehradun
Dehradun is our home city and where most of our 500+ installations live. From narrow Doon Valley plots to large school and hotel rooftops, our engineers know the local UPCL/UPCL-successor net metering process, sanctioned-load rules and monsoon mounting requirements.
Solar irradiance
5.2 kWh/m²/day
Local grid tariff
₹6.5 - ₹7.5 per unit
Installed by us
260+ systems
Localities covered
8 areas

Why Dehradun chooses VOLKOSUN
Engineered for Dehradun rooftops
Local survey, local service and complete subsidy paperwork — handled by a team that installs in Dehradun every week.
Same-day survey
Our survey team reaches most Dehradun addresses within 24 hours.
Local DISCOM desk
We file net metering and follow the file until the bi-directional meter is installed.
Monsoon-ready mounting
Hot-dip galvanised structures rated for Doon Valley wind and rainfall.
Service in 24 hours
City-based technicians for cleaning, inverter checks and breakdowns.
Sizing & savings
Popular System Sizes in Dehradun
Indicative generation and savings at 5.2 kWh/m²/day irradiance and local tariffs of ₹6.5 - ₹7.5 per unit. Your survey report confirms exact numbers.
| System size | Monthly generation | Approx. savings | Roof area |
|---|---|---|---|
| 2 kW | 240-280 units | ₹1,900/mo | 180 sq. ft. |
| 3 kW | 360-420 units | ₹2,850/mo | 270 sq. ft. |
| 5 kW | 600-700 units | ₹4,700/mo | 450 sq. ft. |
| 10 kW | 1200-1400 units | ₹9,400/mo | 900 sq. ft. |
Localities
Areas We Serve in Dehradun
Open your locality page for site-specific detail and a direct survey request.
FAQs
Solar Questions from Dehradun
What is PM Surya Ghar Yojana?
PM Surya Ghar: Muft Bijli Yojana is a Government of India scheme that provides a central financial subsidy on rooftop solar systems for residential consumers, helping households generate their own electricity and reduce monthly bills.
How much subsidy can I get?
Residential customers can receive up to ₹78,000 depending on system capacity — ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW. We handle the complete subsidy application and net metering paperwork for you.
How much space is required for rooftop solar?
As a thumb rule you need about 80-100 sq. ft. of shadow-free roof area per kW. A typical 3 kW home system needs roughly 250-300 sq. ft. Our engineers confirm the exact layout during the free site survey.
How long does installation take?
Most residential systems are installed in 2-4 days after material delivery. Including approvals, net metering and inspection, the end-to-end timeline is usually 3-5 weeks.
Get Your Free Solar Site Survey
Our Office
Opposite JP Badminton Academy,Banjarawala, Dehradun, Uttarakhand
Working Hours
Mon - Sat: 9:30 AM - 6:30 PM
Sunday: Closed
