
Udham Singh Nagar District
Solar Panel Installation in Rudrapur
Rudrapur's SIDCUL belt runs some of the state's largest factory rooftops. We build high-capacity C&I plants here with string-level monitoring and AMC.
Solar irradiance
5.4 kWh/m²/day
Local grid tariff
₹7.0 - ₹8.4 per unit
Installed by us
35+ systems
Localities covered
4 areas

Why Rudrapur chooses VOLKOSUN
Engineered for Rudrapur rooftops
Local survey, local service and complete subsidy paperwork — handled by a team that installs in Rudrapur every week.
Factory-scale EPC
100 kW to 1 MW+ rooftop plants with bankable documentation.
Monitoring dashboard
String-level alerts so generation dips never go unnoticed.
Depreciation benefit
Accelerated depreciation modelling included in the proposal.
Zero-downtime installs
Phased work that keeps your production line running.
Sizing & savings
Popular System Sizes in Rudrapur
Indicative generation and savings at 5.4 kWh/m²/day irradiance and local tariffs of ₹7.0 - ₹8.4 per unit. Your survey report confirms exact numbers.
| System size | Monthly generation | Approx. savings | Roof area |
|---|---|---|---|
| 2 kW | 240-280 units | ₹1,900/mo | 180 sq. ft. |
| 3 kW | 360-420 units | ₹2,850/mo | 270 sq. ft. |
| 5 kW | 600-700 units | ₹4,700/mo | 450 sq. ft. |
| 10 kW | 1200-1400 units | ₹9,400/mo | 900 sq. ft. |
Localities
Areas We Serve in Rudrapur
Open your locality page for site-specific detail and a direct survey request.
FAQs
Solar Questions from Rudrapur
What is PM Surya Ghar Yojana?
PM Surya Ghar: Muft Bijli Yojana is a Government of India scheme that provides a central financial subsidy on rooftop solar systems for residential consumers, helping households generate their own electricity and reduce monthly bills.
How much subsidy can I get?
Residential customers can receive up to ₹78,000 depending on system capacity — ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW. We handle the complete subsidy application and net metering paperwork for you.
How much space is required for rooftop solar?
As a thumb rule you need about 80-100 sq. ft. of shadow-free roof area per kW. A typical 3 kW home system needs roughly 250-300 sq. ft. Our engineers confirm the exact layout during the free site survey.
How long does installation take?
Most residential systems are installed in 2-4 days after material delivery. Including approvals, net metering and inspection, the end-to-end timeline is usually 3-5 weeks.
Get Your Free Solar Site Survey
Our Office
Opposite JP Badminton Academy,Banjarawala, Dehradun, Uttarakhand
Working Hours
Mon - Sat: 9:30 AM - 6:30 PM
Sunday: Closed
