
Dehradun District
Solar Panel Installation in Rishikesh
Hotels, yoga retreats and riverside guest houses in Rishikesh run on high-tariff commercial connections. Solar plus solar water heating cuts their two biggest bills at once.
Solar irradiance
5.3 kWh/m²/day
Local grid tariff
₹7.0 - ₹8.5 per unit
Installed by us
70+ systems
Localities covered
5 areas
Available in Rishikesh
Solutions We Install Locally
Every VOLKOSUN product line is available in Rishikesh with local installation and service crews.
Hospitality specialists
Solar PV plus 500-5000 LPD water heating for hotels and ashrams.
Silent night backup
Hybrid inverters replace diesel gensets for guest comfort.
Riverside corrosion care
Coated hardware for high-humidity Ganga-belt rooftops.
Off-season installs
Scheduling that avoids your peak occupancy weeks.
Sizing & savings
Popular System Sizes in Rishikesh
Indicative generation and savings at 5.3 kWh/m²/day irradiance and local tariffs of ₹7.0 - ₹8.5 per unit. Your survey report confirms exact numbers.
| System size | Monthly generation | Approx. savings | Roof area |
|---|---|---|---|
| 2 kW | 240-280 units | ₹1,900/mo | 180 sq. ft. |
| 3 kW | 360-420 units | ₹2,850/mo | 270 sq. ft. |
| 5 kW | 600-700 units | ₹4,700/mo | 450 sq. ft. |
| 10 kW | 1200-1400 units | ₹9,400/mo | 900 sq. ft. |
Localities
Areas We Serve in Rishikesh
Open your locality page for site-specific detail and a direct survey request.
FAQs
Solar Questions from Rishikesh
What is PM Surya Ghar Yojana?
PM Surya Ghar: Muft Bijli Yojana is a Government of India scheme that provides a central financial subsidy on rooftop solar systems for residential consumers, helping households generate their own electricity and reduce monthly bills.
How much subsidy can I get?
Residential customers can receive up to ₹78,000 depending on system capacity — ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW. We handle the complete subsidy application and net metering paperwork for you.
How much space is required for rooftop solar?
As a thumb rule you need about 80-100 sq. ft. of shadow-free roof area per kW. A typical 3 kW home system needs roughly 250-300 sq. ft. Our engineers confirm the exact layout during the free site survey.
How long does installation take?
Most residential systems are installed in 2-4 days after material delivery. Including approvals, net metering and inspection, the end-to-end timeline is usually 3-5 weeks.
Get Your Free Solar Site Survey
Our Office
Opposite JP Badminton Academy,Banjarawala, Dehradun, Uttarakhand
Working Hours
Mon - Sat: 9:30 AM - 6:30 PM
Sunday: Closed




