Dehradun District
Solar Panel Installation in Vikasnagar
Farmhouses, agri pump sets and gram panchayat street lighting make Vikasnagar and the Jaunsar belt a strong fit for solar pumps, street lights and rooftop plants.
Solar irradiance
5.2 kWh/m²/day
Local grid tariff
₹6.4 - ₹7.4 per unit
Installed by us
30+ systems
Localities covered
4 areas
Available in Vikasnagar
Solutions We Install Locally
Every VOLKOSUN product line is available in Vikasnagar with local installation and service crews.
Solar pump expertise
Agri pump sets and irrigation solutions for farm properties.
Panchayat street lighting
All-in-one solar poles with motion sensing for village roads.
Off-grid backup
Battery systems for areas with frequent outages.
Remote-site service
Scheduled service visits across the Jaunsar-Bawar belt.
Sizing & savings
Popular System Sizes in Vikasnagar
Indicative generation and savings at 5.2 kWh/m²/day irradiance and local tariffs of ₹6.4 - ₹7.4 per unit. Your survey report confirms exact numbers.
| System size | Monthly generation | Approx. savings | Roof area |
|---|---|---|---|
| 2 kW | 240-280 units | ₹1,900/mo | 180 sq. ft. |
| 3 kW | 360-420 units | ₹2,850/mo | 270 sq. ft. |
| 5 kW | 600-700 units | ₹4,700/mo | 450 sq. ft. |
| 10 kW | 1200-1400 units | ₹9,400/mo | 900 sq. ft. |
Localities
Areas We Serve in Vikasnagar
Open your locality page for site-specific detail and a direct survey request.
FAQs
Solar Questions from Vikasnagar
What is PM Surya Ghar Yojana?
PM Surya Ghar: Muft Bijli Yojana is a Government of India scheme that provides a central financial subsidy on rooftop solar systems for residential consumers, helping households generate their own electricity and reduce monthly bills.
How much subsidy can I get?
Residential customers can receive up to ₹78,000 depending on system capacity — ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW. We handle the complete subsidy application and net metering paperwork for you.
How much space is required for rooftop solar?
As a thumb rule you need about 80-100 sq. ft. of shadow-free roof area per kW. A typical 3 kW home system needs roughly 250-300 sq. ft. Our engineers confirm the exact layout during the free site survey.
How long does installation take?
Most residential systems are installed in 2-4 days after material delivery. Including approvals, net metering and inspection, the end-to-end timeline is usually 3-5 weeks.
Get Your Free Solar Site Survey
Our Office
Opposite JP Badminton Academy,Banjarawala, Dehradun, Uttarakhand
Working Hours
Mon - Sat: 9:30 AM - 6:30 PM
Sunday: Closed