
Haldwani · Nainital District
Solar Panel Installation in Kathgodam
Rooftop solar installation, PM Surya Ghar subsidy filing and net metering support for homes, shops and societies in Kathgodam, Haldwani.
Serving Kathgodam — Near Kathgodam station
Local expertise
Rooftop solar for Kathgodam homes & businesses
VOLKOSUN has been installing rooftop solar around near kathgodam station and the wider Kathgodam area as part of our 40+ systems delivered in Haldwani. With irradiance of 5.1 kWh/m²/day and grid tariffs of ₹6.5 - ₹7.8 per unit, a shadow-free rooftop in Kathgodam typically pays back its investment in three to five years.
We start with a free on-site survey in Kathgodam — measuring usable roof area, studying shadows through the day and reviewing your last six electricity bills. You then receive a written proposal with system size, expected generation, subsidy eligibility and net metering timeline before any commitment.
Because our crews and spares are based in Haldwani, service calls in Kathgodamare attended quickly — panel cleaning, inverter checks, monitoring alerts and warranty claims all handled locally.
Free survey
On-site visit in Kathgodam
Subsidy filed
PM Surya Ghar end to end
Local service
Haldwani-based crew
| City | Haldwani |
|---|---|
| District | Nainital |
| Irradiance | 5.1 kWh/m²/day |
| Grid tariff | ₹6.5 - ₹7.8 per unit |
| Nearest landmark | Near Kathgodam station |
Why Kathgodam customers choose us
- Kumaon coverage — Single team covering Haldwani, Kathgodam and Lalkuan.
- Subsidy filing desk — PM Surya Ghar application, inspection and disbursal tracking.
- Terrace-friendly design — Elevated structures so you keep usable terrace space.
Services
What We Install in Kathgodam
Full product range available with local installation and service.
Nearby
Other Areas We Cover in Haldwani
FAQs
Solar in Kathgodam — Questions
Do you install solar panels in Kathgodam?
Yes. Kathgodam in Haldwani is part of our regular service zone. Survey teams reach near kathgodam station and surrounding streets, and installation crews are based in Haldwani.
How long does installation take in Kathgodam?
Most residential systems are installed in 2-4 days after material delivery. Including DISCOM approvals and net metering, the end-to-end timeline is typically 3-5 weeks.
How much subsidy can I get?
Residential customers can receive up to ₹78,000 depending on system capacity — ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW. We handle the complete subsidy application and net metering paperwork for you.
How much space is required for rooftop solar?
As a thumb rule you need about 80-100 sq. ft. of shadow-free roof area per kW. A typical 3 kW home system needs roughly 250-300 sq. ft. Our engineers confirm the exact layout during the free site survey.
How long does installation take?
Most residential systems are installed in 2-4 days after material delivery. Including approvals, net metering and inspection, the end-to-end timeline is usually 3-5 weeks.
Get Your Free Solar Site Survey
Our Office
Opposite JP Badminton Academy,Banjarawala, Dehradun, Uttarakhand
Working Hours
Mon - Sat: 9:30 AM - 6:30 PM
Sunday: Closed
