• PM Surya Ghar Yojana Approved Vendor
  • Zero Electricity Bill
  • Quality Products
  • Expert Installation
  • 25 Year Performance Warranty
Rooftop solar installation by VOLKOSUN in Mussoorie, Uttarakhand

Mussoorie · Dehradun District

Solar Panel Installation in Landour

Rooftop solar installation, PM Surya Ghar subsidy filing and net metering support for homes, shops and societies in Landour, Mussoorie.

Serving Landour — Landour cantonment

Local expertise

Rooftop solar for Landour homes & businesses

VOLKOSUN has been installing rooftop solar around landour cantonment and the wider Landour area as part of our 20+ systems delivered in Mussoorie. With irradiance of 4.8 kWh/m²/day and grid tariffs of ₹7.2 - ₹8.6 per unit, a shadow-free rooftop in Landour typically pays back its investment in three to five years.

We start with a free on-site survey in Landour — measuring usable roof area, studying shadows through the day and reviewing your last six electricity bills. You then receive a written proposal with system size, expected generation, subsidy eligibility and net metering timeline before any commitment.

Because our crews and spares are based in Mussoorie, service calls in Landourare attended quickly — panel cleaning, inverter checks, monitoring alerts and warranty claims all handled locally.

Free survey

On-site visit in Landour

Subsidy filed

PM Surya Ghar end to end

Local service

Mussoorie-based crew

Landour at a glance
CityMussoorie
DistrictDehradun
Irradiance4.8 kWh/m²/day
Grid tariff₹7.2 - ₹8.6 per unit
Nearest landmarkLandour cantonment

Why Landour customers choose us

  • Cold-climate design — Panels and heaters selected for low temperatures and frost.
  • Hotel hot water — ETC systems with electric backup for winter occupancy.
  • Wind-rated structures — Ridge-line mounting engineered for high wind zones.

FAQs

Solar in Landour — Questions

Do you install solar panels in Landour?

Yes. Landour in Mussoorie is part of our regular service zone. Survey teams reach landour cantonment and surrounding streets, and installation crews are based in Mussoorie.

How long does installation take in Landour?

Most residential systems are installed in 2-4 days after material delivery. Including DISCOM approvals and net metering, the end-to-end timeline is typically 3-5 weeks.

How much subsidy can I get?

Residential customers can receive up to ₹78,000 depending on system capacity — ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW. We handle the complete subsidy application and net metering paperwork for you.

How much space is required for rooftop solar?

As a thumb rule you need about 80-100 sq. ft. of shadow-free roof area per kW. A typical 3 kW home system needs roughly 250-300 sq. ft. Our engineers confirm the exact layout during the free site survey.

How long does installation take?

Most residential systems are installed in 2-4 days after material delivery. Including approvals, net metering and inspection, the end-to-end timeline is usually 3-5 weeks.

Get Your Free Solar Site Survey

Call / WhatsApp

95571 98286

Get Free Consultation

Our Office

Opposite JP Badminton Academy,
Banjarawala, Dehradun, Uttarakhand

Working Hours

Mon - Sat: 9:30 AM - 6:30 PM

Sunday: Closed

Request Free Site Survey

Share your details and our solar expert will call you back.