
Rudrapur · Udham Singh Nagar District
Solar Panel Installation in Pantnagar
Rooftop solar installation, PM Surya Ghar subsidy filing and net metering support for homes, shops and societies in Pantnagar, Rudrapur.
Serving Pantnagar — Pantnagar SIDCUL
Local expertise
Rooftop solar for Pantnagar homes & businesses
VOLKOSUN has been installing rooftop solar around pantnagar sidcul and the wider Pantnagar area as part of our 35+ systems delivered in Rudrapur. With irradiance of 5.4 kWh/m²/day and grid tariffs of ₹7.0 - ₹8.4 per unit, a shadow-free rooftop in Pantnagar typically pays back its investment in three to five years.
We start with a free on-site survey in Pantnagar — measuring usable roof area, studying shadows through the day and reviewing your last six electricity bills. You then receive a written proposal with system size, expected generation, subsidy eligibility and net metering timeline before any commitment.
Because our crews and spares are based in Rudrapur, service calls in Pantnagarare attended quickly — panel cleaning, inverter checks, monitoring alerts and warranty claims all handled locally.
Free survey
On-site visit in Pantnagar
Subsidy filed
PM Surya Ghar end to end
Local service
Rudrapur-based crew
| City | Rudrapur |
|---|---|
| District | Udham Singh Nagar |
| Irradiance | 5.4 kWh/m²/day |
| Grid tariff | ₹7.0 - ₹8.4 per unit |
| Nearest landmark | Pantnagar SIDCUL |
Why Pantnagar customers choose us
- Factory-scale EPC — 100 kW to 1 MW+ rooftop plants with bankable documentation.
- Monitoring dashboard — String-level alerts so generation dips never go unnoticed.
- Depreciation benefit — Accelerated depreciation modelling included in the proposal.
Services
What We Install in Pantnagar
Full product range available with local installation and service.
Nearby
Other Areas We Cover in Rudrapur
FAQs
Solar in Pantnagar — Questions
Do you install solar panels in Pantnagar?
Yes. Pantnagar in Rudrapur is part of our regular service zone. Survey teams reach pantnagar sidcul and surrounding streets, and installation crews are based in Rudrapur.
How long does installation take in Pantnagar?
Most residential systems are installed in 2-4 days after material delivery. Including DISCOM approvals and net metering, the end-to-end timeline is typically 3-5 weeks.
How much subsidy can I get?
Residential customers can receive up to ₹78,000 depending on system capacity — ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW. We handle the complete subsidy application and net metering paperwork for you.
How much space is required for rooftop solar?
As a thumb rule you need about 80-100 sq. ft. of shadow-free roof area per kW. A typical 3 kW home system needs roughly 250-300 sq. ft. Our engineers confirm the exact layout during the free site survey.
How long does installation take?
Most residential systems are installed in 2-4 days after material delivery. Including approvals, net metering and inspection, the end-to-end timeline is usually 3-5 weeks.
Get Your Free Solar Site Survey
Our Office
Opposite JP Badminton Academy,Banjarawala, Dehradun, Uttarakhand
Working Hours
Mon - Sat: 9:30 AM - 6:30 PM
Sunday: Closed
